Dredging and pumping works | Tenderlake

Dredging and pumping works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
03 August 2022
Closing Date:
31 August 2022
Location(s):
UKH32 Thurrock (UK UNITED KINGDOM)
Description:
Maintenance Dredging Channel

London Gateway are a Harbour Authority by virtue of the London Gateway Port Harbour Empowerment Order 2008. This HEO allows, in Section 13 – Power to Dredge, the Harbour Authority to dredge, deepen, scour, cleanse, alter, improve the river bed and foreshore to the extent described in Schedule 3 of the HEO, or as may be required for the purpose of maintaining the works described in Schedule 3.

As part of its port needs, LG is planning to carry out a maintenance dredging in the Yantlet channel (Thames Estuary). This campaign, to be performed before the end of this year 2022, will focus in 2 areas (SeaReach 3 and SeaReach 4&5) with a total Volume of circa 1.3Mm3.

LG has a Port of London Authority dredge licence in place (valid until 17 March 2025) covering one campaign/year up to 1.5Mm3/year in Ebb tide. Sediment samples have also been collected in June 2022 and results can be provided to tenderers.

With a final target level of -14.50mCD, tenderers can consider using Trailing suction hopper dredger (TSHD) as well as water injection dredger (WID) to assist in the effectiveness of the dredging.

London Gateway are a Harbour Authority by virtue of the London Gateway Port Harbour Empowerment Order 2008. This HEO allows, in Section 13 – Power to Dredge, the Harbour Authority to dredge, deepen, scour, cleanse, alter, improve the river bed and foreshore to the extent described in Schedule 3 of the HEO, or as may be required for the purpose of maintaining the works described in Schedule 3.

As part of its port needs, LG is planning to carry out a maintenance dredging in the Yantlet channel (Thames Estuary). This campaign, to be performed before the end of this year 2022, will focus in 2 areas (SeaReach 3 and SeaReach 4&5) with a total Volume of circa 1.3Mm3.

LG has a Port of London Authority dredge licence in place (valid until 17 March 2025) covering one campaign/year up to 1.5Mm3/year in Ebb tide. Sediment samples have also been collected in June 2022 and results can be provided to tenderers.

With a final target level of -14.50mCD, tenderers can consider using Trailing suction hopper dredger (TSHD) as well as water injection dredger (WID) to assist in the effectiveness of the dredging.

Download full details as .pdf
The Buyer:
London Gateway Port Limited
CPV Code(s):
45252124 - Dredging and pumping works