Construction work for water and sewage pipelines | Tenderlake

Construction work for water and sewage pipelines

Contract Value:
EUR 10M - 10M
Notice Type:
Contract Notice
Published Date:
26 December 2023
Closing Date:
19 February 2024
Location(s):
PT16I Médio Tejo (PT PORTUGAL)
Description:
Carrying out the duplication of a section of the Castelo do Bode pipeline, installing a new pipeline parallel to the existing one.
Castelo do Bode Adductor - Duplication - Phase 1 - Torre Brogueira/Sobral

Carrying out the works aimed at the duplication of the pipeline, in a section where such duplication does not yet exist, proceeding with the installation of a new pipeline (DN1800mm) parallel to the existing one, taking advantage of the strip previously expropriated by EPAL with 15 (fifteen) meters wide.

Duplication of the section of the Castelo do Bode Pipeline, in the area between Brogueira and Sobral

Download full details as .pdf
The Buyer:
EPAL - Empresa Portuguesa das Águas Livres, S. A.
CPV Code(s):
45231300 - Construction work for water and sewage pipelines