Lille district heating network - BD Vauban branch.
Demolition work:
- approximately 188 ml of firm slice and 88 ml of optional slice;
- site preparation and marking of existing networks;
- additional surveys to identify existing networks;
- the constraints of complex traffic lanes and local information;
- construction of the trenches according to the requirements of the pipe supplier;
- embankments in accordance with the various prescriptions;
- the restoration of the works deposited;
- the implementation of materials for laying pipes;
- carrying out surveys and CAD / DAO plans for heating networks;
- the repair of the roadway according to the various prescriptions.