BlT AG is renewing the track superstructure including level crossings and plant line work in the section Freidorf to Zum Park of tram line 14 in Muttenz. In addition, the stops Freidorf, Käppeli and Rothausstrasse will be renewed as part of the route closure. The stops Freidorf and Käppeli are in the reconstruction perimeter of the track construction.
BlT AG is renewing the track superstructure including level crossings and plant line work in the section Freidorf to Zum Park of tram line 14 in Muttenz. In addition, the stops Freidorf, Käppeli and Rothausstrasse will be renewed as part of the route closure. The stops Freidorf and Käppeli are in the reconstruction perimeter of the track construction.