FDE over 3.9 km
- Milling concrete 12,500 m2
- Full asphalt milling 63,500 m2
- PAH-containing HVT accommodate 57,900 m2
- Install asphalt (ATS, ABS, ADS) 17,900 m2
- Create a concrete ceiling (d = 29.5cm) 58,700 m2
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.