The subject of the contract includes the collection and management of municipal solid waste from the area of the Kowalewo Pomorskie Commune in the period 01.01.2023 to 31.12.2023. The scope of the contract applies to inhabited and uninhabited real estate from the territory of the Municipality, the service should be performed in a way that ensures the achievement of appropriate levels of recycling, preparation for re-use of paper, metals, plastics and glass and reducing the weight of biodegradable waste transferred to landfill and the level of storage in accordance with the provisions of the Act of 13 September 1996 on maintaining cleanliness and order in municipalities (Journal of Laws of 2022, item 1297 from late. died.). The implementation of the service will be carried out in accordance with the applicable acts of local law issued on the basis of the provisions of the above-mentioned Act, including m.in the Regulations for Maintaining Cleanliness and Order in the Commune and the Resolution on the detailed manner and scope of providing services in the field of collecting municipal waste from property owners from the Kowalewo Pomorskie Commune and managing this waste in exchange for a fee paid by residents for municipal waste management. The Ordering Party reserves the right to change the above-mentioned resolutions to the extent necessary to adapt their provisions to the applicable law.
1. The Contractor is obliged to comply with the law during the performance of the contract, including reaching the required levels. 2. The Contractor shall be obliged to purchase and deliver to the owners of uninhabited real estate and property owners containers intended for the collection of any amount of municipal waste of adequate strength for a given type of waste, made of plastic. The containers referred to in Section III of the SWZ must be delivered by 1 January 2023. The costs related to the purchase and placement of containers shall be borne by the Contractor and it is not possible to charge them to the Ordering Party. During the performance of the contract, the Contractor will be obliged to equip the property with appropriate containers in accordance with the Ordering Party's notification, the delivery of which to the indicated properties will take place within 5 working days from the date of notification by the Ordering Party. This applies to the situation of changing the number of containers on a given property, or new properties, if they appear during the execution of the order. If during the collection of waste there is damage or destruction due to the fault of the Contractor of the containers, the Contractor during the performance of the contract will be obliged to additionally deliver the containers at his own expense. The Ordering Party shall not be liable for waste containers delivered by the Contractor for lost, destroyed or damaged in any other way (e.g. arson). 3. As part of the offer price for the implementation of the subject of the contract, the Contractor will be obliged each time (i.e. in one collection cycle) to collect and manage from the property owners any quantity of the following municipal waste: 1) non-segregated (mixed) municipal waste; 2) municipal waste separately collected "at source" (paper, metal, plastics, glass and multi-material packaging, biodegradable municipal waste and ash); 3) waste from cemeteries with codes 200201, 200202, 200203 4. The contractor will be obliged to weigh the collected municipal waste on a legalized scale. 5. The Contractor shall be obliged to deliver the waste at its own expense to the installation intended for substitute service in the event of a regional failure of the installation. 6. The Contractor will be obliged to monitor the obligation incumbent on the owner of the property in the field of separate collection of municipal waste. 7. As part of the implementation of the subject of the contract, the Contractor will not be able to mix selectively collected municipal waste with non-segregated (mixed) municipal waste. 8. Under the contract, the Contractor will be obliged to develop a waste collection schedule for 2023 and to distribute it to property owners and other documents related to the waste management system, unless they require confirmation of receipt. The Contractor shall provide the contractor to residents by the following deadline by January 1, 2023 9. The Contractor shall be liable for damage to the property of the Ordering Party or third parties during the collection of waste. 10. The Contractor will be obliged to collect waste lying next to garbage cans and containers, if it is the result of his action. 11. The Contractor will be obliged to provide the service also in the event that access to the property is difficult, in particular in the case of bad weather conditions, poor condition of the road surface, repairs, detours, etc. 12. The Contractor will be obliged to perform the subject of the contract manually by boring containers for vehicles or, for example, vehicles with small dimensions enabling the collection of waste from real estate, access to which is difficult due to, for example, narrow entrances, low gates, etc. 13. The Contractor is obliged to keep documentation related to the performance of the contract referred to in Section III of the SWZ