At the Gossauerstraße (Oetwil am See / Egg / Gossau) from the roundabout Zelgli to Leerüti, the bicycle lane weaknesses have to be remedied and the repair of the road has to be planned. The connection to the Forchautostraße A52 and the Knoten Esslingerstraße have to be redesigned.
Engineering services for SIA sub-phases 31 (pre-project) up to and including 53 (commissioning / completion).
For detailed specifications see tender documents.
At the Gossauerstraße (Oetwil am See / Egg / Gossau) from the roundabout Zelgli to Leerüti, the bicycle lane weaknesses have to be remedied and the repair of the road has to be planned. The connection to the Forchautostraße A52 and the Knoten Esslingerstraße have to be redesigned.
Engineering services for SIA sub-phases 31 (pre-project) up to and including 53 (commissioning / completion).
For detailed specifications see tender documents.