Wall-covering and wall-papering work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 September 2022
Closing Date:
14 October 2022
Location(s):
DE804 Schwerin, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Structural redesign CFFK, House 39, Lot 12: Painter

The buildings of the Carl-Friedrich-Flemming Klinik (CFFK) were built in several construction phases from 1824-1913 to accommodate the mentally ill. House 39 was built in 1911 as a reception centre for women. The DG of the elongated two-storey building was expanded in 1960. In 1970 further extensive renovation work took place. The aim of the structural redesign of the CFFK is to improve the accommodation of patients and to restructure

of the functional areas within the respective clinic. In the course of the reorganization, station 26 of the upper floor moves into house 22. The psychiatric and psychotherapy wards 24 and 25 already in building 39 will remain there. In the future, ward 24 for patients with depression will be accommodated on the ground floor.

Ward 25 for patients with personality disorders is located on the upper floor. The DG is fully involved in the usage concept. ==References==

various offices of the wards (occupational therapy, psychologists with associated adjoining rooms), the changing rooms for the staff and the therapy kitchen. In the partial KG, the storage and technical rooms and a ventilation center are provided. House 39 can be entered via three entrances arranged in the risalites. The two staircases for vertical access are housed in the lateral transepts. In the middle risalit, a bed-accessible elevator will be created in the course of the redesign to supply and dispose of all levels of the house (E01/0/1/2) and to ensure accessibility. After the building has been cleared, the individual levels are adapted to the new usage concept as well as to the applicable building regulations requirements. The 1st BA begins even before the free movement of the building. In the 1st BA, external development is preferred. The 2nd BA includes the complete gutting and restructuring of the building, including the subsequent installation of an elevator shaft while at the same time replacing parts of the floor ceiling. In the course of the redesign, the Community

Sanitary facilities replaced by sanitary cells assigned to the bed rooms. The building envelope remains largely untouched.

approx. 7,474 m² basic, intermediate and final coating of wall and ceiling surfaces inside; approx. 315 m² floor coating; Repair work façade painting in single and small areas; painting and coating work on steel frames, heating pipes, railings, wooden doors and windows; Foil stickers, signage