Supply and installation of anchors with low ecological impact in the locations indicated in the PPT (The rest of the material that makes up the anchor train is not part of this contract, since it is MP Port de Roses, SA's own material)
Removal of existing concrete dead that impact the phanerogam meadow as well as a number of other existing waste (which will be detailed in the following points) Transport of waste generated to authorized manager.
The need to be satisfied is to replace the existing conventional anchors (concrete death) with others with low environmental impact as well as the removal of deaths that are not currently useful and other existing waste located on seagrass meadows, in the field of buoy fields for anchoring boats in Roses that the city council has
authorized (and managed through the municipal company MP Port de Roses, SA), to restore the seabed and ensure a more respectful and favorable service to the conservation of the environmental heritage of the seabed of Roses.