Demolition of former Castle Court Hotel on Church street in Cahir and associated structures, walls and concrete slabs. The site is to be fully cleared of all trees, roots and vegetation. 36 linear meters of 5.5m deep secant piles are to be designed and installed, site power ducting from a esb sub station close buy is to be installed, including all required chambers. excavation and filling to formation level is also required across the entire site.
Demolition of former Castle Court Hotel on Church street in Cahir and associated structures, walls and concrete slabs. The site is to be fully cleared of all trees, roots and vegetation. 36 linear meters of 5.5m deep secant piles are to be designed and installed, site power ducting from a esb sub station close buy is to be installed, including all required chambers. excavation and filling to formation level is also required across the entire site.