- Performing required topographic measurements,
- Further work on the bottleneck analysis of the Flemish traffic center,
- Performing the required traffic simulations,
- The preparation of conceptual designs and preliminary designs,
- The preparation of licensable (construction) designs,
- Drawing up project EIA files,
- Drawing up an application for an environmental permit (s),
- If necessary, drawing up expropriation plans and guidance during the entire process up to and including the actual expropriation,
- Performing the required archaeological (preliminary) research,
- Drawing up the required demolition follow-up plan,
- Preparing the required file transfer utility lines,
- Determining the required environmental hygiene soil investigation,
- Determining the required CTE examination,
- Determining the required additional archaeological site research,
- The preparation of definitive architectural designs and tender documents,
- The supervision during the execution of the works up to and including the delivery (s).
The subject of the assignment is of the type of design and consultancy assignment. The study will investigate the optimization of the configuration of the E40 based on a traffic engineering preliminary study / bottleneck analysis of the Flemish Traffic Center.