Conversion and renovation of Halls 2 and 3, Bahnmeisterei and Lokschuppen
SanitaryIn freight halls 2 and 3 of the Oberhafenquartier of HafenCity, usable areas for cultural and creative use, as well as in the locomotive shed and parts of the ground floor of the Alte Bahnmeisterei are to be used for a club. For this purpose, the existing warehouses, the buildings Alte
Bahnmeisterei and the locomotive shed are to be prepared.
Performance summary:
Dismantling of pipe steel/copper DN 12 to DN 50 incl. insulation: approx. 220 running meters
SML pipe DN 100 to DN 160 incl. fittings and fittings: 70 running metres;
Drinking water pipe made of stainless steel DN 12 to DN 50: approx. 650 running metres;
Shut-off valves DN 12 to DN 50: 26 pcs.; Fitting water meter: 21 pcs;
Flow divider: 6 pcs; Outdoor tap in surface-mounted cabinet: 7 pcs; Flushing station: 1 piece; Urinal gutter: 1 pc.
heaterIn freight halls 2 and 3 of the Oberhafenquartier of HafenCity, usable areas for cultural and creative use, as well as in the locomotive shed and parts of the ground floor of the Alte Bahnmeisterei are to be used for a club. For this purpose, the existing warehouses, the buildings Alte Bahnmeisterei and the locomotive shed are to be prepared.
Performance summary:
Dismantling of pipe steel/copper DN 12 to DN 50 incl. insulation: approx. 230 running meters
Ball valve DN 12 to DN 40: approx. 190 pcs; Regulating valves, differential pressure regulators DN 15 to DN 40: 63 pcs.;
C-steel pipe with fittings and fittings, insulation DN 12 to DN 50: approx. 3,600 running metres
Radiant ceiling panels incl. control, accessories: approx. 1,100 m²
Steel tube radiators and accessories: 5 pcs., compact radiators: 4 pcs.; Convection heaters and accessories: 4 pcs.
Ventilation-RefrigerationIn freight halls 2 and 3 of the Oberhafenquartier of HafenCity, usable areas for cultural and creative use, as well as in the locomotive shed and parts of the ground floor of the Alte Bahnmeisterei are to be used for a club. For this purpose, the existing warehouses, the buildings Alte Bahnmeisterei and the locomotive shed are to be prepared.
Performance summary:
Tubular fan DN 200, DN 160, DN 125 incl. heating coil, CO2 control: 19 pcs.
Decentralised HVAC unit for ceiling mounting 600 m³/h; 450 m³/h; each 1 pc.
HVAC unit for outdoor installation incl. heating and cooling register: 18,000 m³/h: 1 pcs.
Wickelfalzrohr DN 100 – DN 250: ca. 500 lfdm
Sheet metal duct and moulded parts inside and outside: approx. 200 m²
Single-split refrigeration system 3.5 kW: 1 pcs.
VRV chiller 45 kW: 2 pcs.
Refrigerant line 6mm – 28 mm: approx. 40 running meters
Electrical workIn freight halls 2 and 3 of the Oberhafenquartier of HafenCity, usable areas for cultural and creative use, as well as in the locomotive shed and parts of the ground floor of the Alte Bahnmeisterei are to be used for a club. For this purpose, the existing warehouses, the buildings Alte Bahnmeisterei and the locomotive shed are to be prepared.
For the electrical installation, meter cabinets in large cabinet design and general distribution boards for the new technical rooms are provided. Approx. 10 km of electrical conduits, approx. 2 km of halogen-free main cables and approx. 20 km of halogen-free installation cables are laid.
For the equipment of the rental units, approx. 20 installation distributors are provided with ready-to-connect distributors with safety elements NH00.
In addition to general basic lighting, emergency lighting is also provided, connected to the existing central battery system.
In addition to a fire alarm system, a voice alarm system is also provided.
Earthing system and lightning protection system are also provided.