Carpentry work on the new construction of the family pool in Penzberg
carpentry work-Equipment foyer main entrance with various column cladding, benches, vending machine cladding Cash desk with rear cabinet, ceiling
and wall cladding as cassette, approx. 70 m²
-Ground floor shop zone with 2 racking systems
-Hair dryer area changing room with approx. 11 lfm hair dryer including crystal mirror system
-Hair dryer area collective changing room with approx. 8 lfm hair dryer including crystal mirror system
-2 piece pocket shelves and 2 pieces hook strips
-Equipment sauna courtyard with 2 benches and 1 table made of steel substructure with last cladding.
-approx. 125 m² wooden panelling with larch mouldings as wall covering in the swimming pool
-3 pieces folding changing tables.
carpentry work-approx. 30 m parapet cover as a bench
-1 piece room divider as privacy screen
-2 piece pocket shelves and 1 piece hook strip
-2 baskets as a bench seat
-5 piece benches, approx. 30 lfm
-1 piece bar counter with return buffet rounded
-3 pieces of built-in shelves
-37 pieces slider divider on running rail, ceiling hanging.
-12 pieces of acoustic panels
-3 pieces of washbasin bases
-1 piece changing table
-Equipment swimming pool catering with room divider, 10 lfm bench etc.
-1 piece of work counter of the bathing supervision with base cabinets, approx. 6 lfm.