The basic pipe network in the basement and in the outdoor area is to be partially renovated. The work will take place while the hospital is still in operation.
175 m3 Earthworks KG;
250 m sewer pipe new SN 10;
30 pcs. Inliner DN 150 and DN 300;
Rinsing / documenting, measuring;
250 m2 of concrete in KG after laying new basic pipes;
320 m2 dismantling of paving concrete and natural stone as well as crushing sand;
Break off 100 m2 of asphalt surface;
630 m3 shaft work head holes and trenches;
Dismantling fixed installations (waste baskets, benches, bicycle racks, etc.);
8 St. Winkelstützwände;
30 St. Betonblockstufen;
2 new sewage shafts;
restoration of external surfaces;
Ersatzpflanzungen;
construction site equipment;
Kampfmitteldetektion;
Abfalldeklaration.