For the supply of the 79 power supply points with a total consumption of approx. 3.76 million kWh will be tendered for the years 2020 and 2021. The supply is mandatory with 100% green electricity - of which 50% from new plants - to ensure. There is a two-time extension option of one year each. Supply points are both larger outlets (eg schools and administration buildings) and outlets with low annual consumption.
For the supply of the 79 power supply points with a total consumption of approx. 3.76 million kWh will be tendered for the years 2020 and 2021. The supply is mandatory with 100% green electricity - of which 50% from new plants - to ensure. There is a two-time extension option of one year each. Supply points are both larger outlets (eg schools and administrative buildings) and outlets with low annual consumption