New construction and operation of Störmthal Canal lifting line 2023 – 2025, 2026 – 2032 optional
(Service description according to § 31 Abs. 2 Nr. 1 VgV - Description of the task to be solved)
Work planning/execution planning for lifting lines
Production of a lifting line at the lock structure and a pipe crossing
Extraction structure in the upper outer harbour at WSP 117.0 m NHN with suction basket/rake
Introduction in Störmtrahler Kanal at WSP 113.00 mNHN
Length of the cable approx. 300m, capacity min. 800 l/s
Regular operation and maintenance incl. recording of water levels, flows, and remote data transmission
New construction and operation of Störmthal Canal lifting line 2023 – 2025, 2026 – 2032 optional
(Service description according to § 31 Abs. 2 Nr. 1 VgV - Description of the task to be solved)
Work planning/execution planning for lifting lines
Production of a lifting line at the lock structure and a rough crossing
Extraction structure in the upper outer harbour at WSP 117.0 m NHN with suction basket/rake
Introduction in Störmtrahler Kanal at WSP 113.00 mNHN
Length of the cable approx. 300m, capacity min. 800 l/s
Regular operation and maintenance incl. recording of water levels, flows, and remote data transmission