The historic town hall of Vacha is to be renovated. For this purpose, the services “drywall side wings” are required. For more information, see tender documents.
445 m3 scaffolding
170 m2 dividing wall, 2-layer planked, partially version F30 and F60
86 m2 facing shells
345 m2 of thermal insulation between rafters+vapor barrier and counter battens
300 m2 sloping roof cladding, 2-ply, partly version F30
68 m2 wallcovering with GKB plates
270 m2 ceiling, 2-layer, fire protection panels type DF, version F60
270 m2 mineral wool insulation boards on suspended ceiling, d= 50 mm
85 m2 carrier and column clothing with fire protection panels F60
260 m2 finished element, gypsum fibreboard 12.5 mm + 12.5 mm + 10 mm
260 m2 compensation fill d = 10 mm+footfall sound insulation wood fibre insulation board