Conversion of the former restaurant into the town hall as well as new construction of the Bürgersaal and the functional buildings exterior facilities
ca. 200 m³ Oberbodenarbeiten
approx. 300 m³ of soil loosening
ca. 40 m³ Grabenaushub
ca. 25 m³ Leitungsgrabenverfüllung
ca. 100 m Drainageleitung
ca. 20 m Abwasserkanal DIN 100
3 St. Straßenablauf
6 St. Hofablauf
approx. 15 m drainage channel
ca. 310 m³ Frostschutzschicht
approx. 10 m² asphalt base course
approx. 10 m² asphalt surface course
ca. 30 m² Rasenfugenpflaster
ca. 490 m² Granitgroßpflaster
approx. 6 m granite, 1 line
approx. 30 m granite, 2 lines
approx. 50 m granite, 3 lines
approx. 130 m curbs concrete
ca. 60 m Granithochbord
ca. 36 m Blockstufen
4 St. Mauerscheiben
approx. 825 m² lawn
approx. 14 trees
1 psch. Miscellaneous equipment