Replacement new combination pool Dresden-Prohlis, painting work (ref .: KBP_3.4).
- 2,350 m 2nd Prime / paint walls;
- 2 060 m 2nd Fill walls;
- 555 m 2nd Prime / paint ceilings;
- Prime / paint 5 stairs;
- Prime / paint 70 m railings / handrails;
- Prime / paint 20 steel doors with frames;
- 140 m 2nd ETICS, 30m edge protection profile.
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.