Construction project: Heinrich-Braun-Klinikum gemeinnützige GmbH - Location Zwickau - House 4
Performance: Chiller replacement
1 chiller approx. 420 kW
2 recoolers with approx. 280 kW each with collection and retention system
Approx. 150m medium-heavy steel pipe 26.9 to 168.3 mm with moulded parts and insulation
Disassembly 1 chiller and 2 dry coolers, pipe, fittings