Building construction work | Tenderlake

Building construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
24 May 2023
Closing Date:
27 June 2023
Location(s):
DE939 Stade (DE Germany/DEUTSCHLAND)
Description:
Construction of a 3+2 field sports hall in Buxtehude

Lot 1 Heat generation, Lot 2 Heating and instrumentation and control technology, Lot 3 Ventilation technology:

The Hanseatic city of Buxtehude intends to build a sports hall as a replacement building at the integrated comprehensive school (IGS) school site. The new sports hall is planned as a 3-field hall in combination with a 2-field hall. The construction project is to be awarded a sustainability certificate from the German Sustainable Building Council (DGNB) in the “Gold” category.

After completion of the preparatory work on the site, the sports hall will be erected with a supporting structure made of reinforced concrete columns and steel trusses. The hall space of the triple sports hall will be equipped with a spacious grandstand system and the roof of the three-field hall will be greened with roofs.

The specifications describe the services of heat generation, heating and instrumentation and control technology, ventilation technology for the three- and two-field hall.

Lot 1 Heat generation:

3 pcs 40kW air-to-water heat pump + 3,000l buffer tank

1 piece 80kW water-to-water heat pump + 3,000l buffer tank

1 piece fresh water module 206l

230 rm. Heating pipelines as steel pipe DN 15 – DN 100 incl. thermal insulation.

Lot 2 Heating technology and I&C technology:

330 rm. Heating pipelines as steel pipe DN 15 – DN 100 incl. thermal insulation

2,000 running meters. Heating pipes as copper pipe 15x1mm – 54x2mm incl. thermal insulation

650 rm. Heating piping as carbon steel pipe 15x1mm – 54x2mm incl. thermal insulation

40 pieces of compact radiators

32 tubular radiators

450m Deckenstrahlplatten

770 data points

8.500 lfdm. Mantelleitungen IY(ST)Y

5,500 running meters. Control lines YSLYCY-JZ.

Lot 3 Ventilation technology:

1 ventilation unit 32,000 m³/h with heat recovery and heating coil

2 units of ventilation unit 6,000 m³/h with heat recovery and heating coil

1 ventilation unit 4,000 m³/h with heat recovery and heating coil

2 Kompaktlüftungsgeräte 500 - 1.000 m³/h

2.500 m² Luftkanal

1.100 m Wickelfalzrohr DN 100 – DN 560

75 air outlets from 250 –950 m³/h

85 pieces of fire dampers.

Download full details as .pdf
The Buyer:
Hansestadt Buxtehude(LK Stade)
CPV Code(s):
45210000 - Building construction work