Computer and high current installation for digitization in schools and educational institutions, primary school Soldnerstraße 50.
Main amounts:
— approx. 2 distribution systems (01.01),
— approx. 150 built-in equipment/safety equipment (01.02),
— approx. 800 m of Lay systems (01.03),
— approx. 22 000 m of power and low-current cable (01.04),
— approx. 560 installation devices (01.5),
— approx. 280 IT components (01.06)
— approx. 150 fire bulkheads (01.07).