All work (earthwork, asphalt and plastic surfacing work including enclosing and drainage) for the restoration of sports field including 40m long jump facility, 100m running track, repair tartan pitch and adjacent lawns.
Main amounts:
Drainage lines approx. 360 m
Underbody application approx. 2,100 m3
Topsoil application approx. 1,000 m3
Foundation approx. 450 m3
Drain asphalt approx. 150 tons
Plastic flooring approx. 1,100 m2
All work (earthwork, asphalt and plastic surfacing work including enclosing and drainage) for the restoration of sports field including 40m long jump facility, 100m running track, repair tartan pitch and adjacent lawns.
Main amounts:
Drainage lines approx. 360 m
Underbody application approx. 2,100 m3
Topsoil application approx. 1,000 m3
Foundation approx. 450 m3
Drain asphalt approx. 150 tons
Plastic flooring approx. 1,100 m2