Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
31 March 2020
Closing Date:
07 May 2020
Location(s):
DK031 Fyn (DK Denmark/DANMARK)
Description:
Vollsmose of the future - supply package 3

This offer includes the establishment of a pedestrian street at Egeparken, a pedestrian street between Bøgeparken and Gillestedvej, a pedestrian street between Birkeparken and Tjørnehaven, as well as internal path connections between respectively. Egeparken and Abildgårdsskolen as well as Hybenhaven and Vollsmosestien.

The offer includes:

1) Clearing existing forest of peace

2) Establishment of pedestrian streets and paths and speed-reducing measures

3) Establishment of pipe underpasses at Vollsmoserenden

4) Establishment of urban spaces along paths and pedestrian streets incl. set up and supply of furniture

5) Delivery and installation of lighting equipment (luminaire for road lighting supplied by the developer)

6) Drainage incl. establishing rainwater basins.

The contract includes soil, drainage, conduits, unbound substrates, asphalt, surface coatings, paving, marking equipment, lighting, planting and various equipment and fixtures.

Offer package 3 is the last of 3 tender packages for the Future Vollsmose. Contract work will have to be coordinated with the workers in development plans for the area.

The contract is to be carried out in the period from September 2020 to November 2021. Some works will be carried out after delivery. See the tender documents.

Egeparken

Preparatory work for expansion of existing traffic signaling facility Vollsmose Allé / Egeparken / Bådvej

Clearing approx. 4 700 m 2 scattered vegetation

Ca. 4 500 m 2 new lane and bike paths

Ca. 3 300 m 2 OB coating on trails and squares

Ca. 450 m 2 tiled pavement

Speed-reducing measures (2 circular bumps and raised surfaces)

Ca. 6 800 m 3 rainwater basin with inlet and outlet buildings

Ca. 1 170 m (ø 160 -700 mm) rainwater pipes

Ca. 40 lighting masts.

Various fixtures, plantings, rubber coatings, steel edges and power lighting

Bøgeparken

Clearing approx. 14 000 m 2 greenery

Ca. 8 800 m 2 new lane and bike paths

Ca. 4 600 m 2 OB coating on trails and squares

Ca. 250 m 2 tiled pavement.

Speed-reducing measures (15 cushion bumps)

Ca. 4 000 m 3 rainwater basin with inlet and outlet buildings

Ca. 1 200 m (ø 160 -600 mm) rainwater pipes

Ca. 60 lighting masts.

Various fixtures, plantings, rubber coatings, steel edges and power lighting

Birkeparken

Clearing approx. 5 700 m 2 greenery

Ca. 7 800 m 2 new lane and bike paths

Ca. 6 400 m 2 OB coating on trails and squares

Ca. 720 m 2 tiled pavement.

Speed-reducing measures (4 cushion bumps and raised surfaces)

Ca. 3 400 m 3 rainwater basin with inlet and outlet buildings

Ca. 1 500 m (ø 160-1000 mm) rainwater pipes

Ca. 50 m plumbing (ø 2 000) of the Vollsmoserenden

Ca. 75 lighting masts.

Various fixtures, plantings, rubber coatings, steel edges and power lighting

rosehip Haven

Clearing approx. 1 200 m 2 greenery

Ca. 230 m 2 bicycle path

Ca. 25 m (ø160) rainwater pipes

Ca. 10 m plumbing (ø 1000) of the Vollsmoserenden

Ca. 7 lighting masts

Establishment of wooden deck / bridge in §3 area

Various fixtures, planting, steel edges and power lighting.

school path

Clearing approx. 5 500 m 2 greenery

Ca. 7 900 m3 excavation of former landfill

Ca. 1 500 m 2 bicycle path

Ca. 120 m (ø 160) rainwater pipes

Ca. 21 lighting masts

Various fixtures, plantings, rubber coatings, steel edges and power lighting.

Gillestedvej

Ca. 1 200 m 2 bike trails

Ca. 150 m 2 pavement in concrete paving stones

Speed-reducing measures (5 cushion bumps)

Ca. 20 m (ø160) rainwater pipes

Various fixtures and plantings.

The contract includes partial in-house design of, for example, wooden decks.

Download full details as .pdf
The Buyer:
Odense Kommune, By- og Kulturforvaltningen
CPV Code(s):
45000000 - Construction work