The purpose of this contract is to carry out the wastewater drainage network in place of Almas da Areosa, with the construction of about 1 000 m of gravity network and 28 home extensions being planned.
The purpose of this contract is to carry out the wastewater drainage network in place of Almas da Areosa, with the construction of about 1 000 m of gravity network and 28 home branches