DVA Test Centre and separate office accommodation designed to current standards with site works including access roads, junction upgrade and significant retention structures due to level changes (approx 17 m).
Test Centre (3 942 m
Depot (3 209 m
M and E: power, data, heating, ventilation and lighting.
Sustainability: PV arrays, solar panels, passive cooling, SUDS and rain water harvesting.
Utilities: HV cabling, substation, drainage with connections to existing system Interface with employer's direct suppliers BREEAM excellent target NEC3 ECC design and build.
DVA Test Centre and separate office accommodation designed to current standards with site works including access roads, junction upgrade and significant retention structures due to level changes (approx 17 m). Test Centre (3 942 m
Depot (3 209 m
M and E: power, data, heating, ventilation and lighting.
Sustainability: PV arrays, solar panels, passive cooling, SUDS and rain water harvesting.
Utilities: HV cabling, substation, drainage with connections to existing system interface with employer's direct suppliers BREEAM excellent target NEC3 ECC design and build.