supply, delivery and installation of containers for the collection of glass on a voluntary basis. The framework agreement is divided into 2 lots: - lot 1: Overhead bollards without civil engineering - lot 2: Underground bollards with civil engineering
Overhead bollards without civil engineeringsupply of air containers for glass collection; transport and installation of air containers to the place of establishment; installation of equipment at planned deployment sites; Functional testing of installed hardware. repair and change of possible parts
Buried bollards with civil engineeringsupply of underground containers for glass collection; transport and placement of underground containers to the place of establishment; civil engineering related to the installation of underground bollards; installation of equipment at planned deployment sites; Functional testing of installed hardware. preventive maintenance of underground bollards; repair and change of possible parts