Stadtwerke Rheine intend to build a new indoor pool at the existing outdoor pool on Kopernikusstrasse.
- Basement: approx. 2,060 m 2 GFA and 6 638 m 3 BRI,
- Ground floor: approx. 3 350 m 2 GFA and 14 621 m 3 BRI,
- Upper floor: approx. 895 m 2 GFA and 4 941 m 3 BRI,
- Total: approx. 6,305 m 2 GFA and 26 200 m 3 BRI.
Pool cover approx. 100 m 2 .
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.