The subject of this contract is the construction works in the framework of the project “Modernization of thermal management for municipalities: Bytom and Radzionków — 2015-2020" — Contract VII — Task “Replacing the external receiving system powered from GWC-2 Godulska 15 in Bytom”.
The project is co-financed by the Cohesion Fund in the framework of the Operational Programme “Infrastructure and Environment” 2014-2020, priority axis I Reducing the emissivity of the economy, action 1.7 Comprehensive elimination of low emissions in the Silesian Voivodeship, subaction 1.7.2 Effective heat and cold distribution in the Silesian Voivodeship.
The scope of construction works includes the replacement of the low-parameter district heating network made in traditional channel technology with a low-parameter preinsulated heating network of approximately 0.622 km.
The subject of this contract is the construction works in the framework of the project “Modernization of thermal management for municipalities: Bytom and Radzionków — 2015-2020" — Contract VII — Task “Replacing the external receiving system powered from GWC-2 Godulska 15 in Bytom”.
The scope of construction works includes the replacement of the low-parameter district heating network made in traditional channel technology with a low-parameter preinsulated heating network of approximately 0.622 km.
A detailed description of the object of the order is provided in Part II of the SWZ — OPZ, together with the annexes.
DATE OF PERFORMANCE OF THE ORDER
1. The Parties shall set the following deadlines for the implementation of the subject matter
(a) The commencement of construction works will occur no later than 7 days after the acquisition of the construction site.
(b) The supply of the material should be reported for receipt after the acquisition of the construction site and after fulfilment of the conditions laid down in the ZPK (the scope of the technological work is set out in Annex 6 to the contract).
(c) Technological work enabling heat to customers should be carried out and reported for reception by 31 August 2021 (the scope of technological work is set out in Annex 6 to the Agreement).
(d) Final work shall be carried out and reported for receipt by 31 October 2021.
e) Completion of the subject matter of the contract — up to 7 months after the signing of the contract
2. The Contracting Authority shall set a time limit for the commencement of the reception activities and notify the Contractor in writing or in the form of an e-mail up to 5 days after receipt of the notification, indicating the place and date of commencement of the receipt of the request.
3. The Contractor shall be drawn up by the Contractor:
(a) a protocol without comments, which is the basis for invoice issuing;
(b) a Memorandum of Notes — not constituting a basis for invoice, not resulting in the accrual of contractual penalties;
(c) a negative result protocol — not a basis for invoice issuing, resulting in contractual penalties after exceeding the deadlines of implementation.