Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
17 August 2021
Closing Date:
20 September 2021
Location(s):
FRC12 Nièvre (FR FRANCE)
Description:
Rehabilitation of building 2 Cobalt site in Nevers

This work operation is divided into 16 lots: Lot 2: Masonry - reinforced concrete Lot 3: Framing - Cover - Zinc Plating Lot 4: External joinery - blackout Lot 5: Facade sheathing - interior sheathing Lot 6: Locksmithing Lot 7: Dryer plastering - insulation Lot 8: Carpentry Wood - parquet Lot 9: Painting Lot 10: Tiles - earthenware Lot 11: False Ceilings - Acoustic Panels Lot 12: Modular partitions Lot 13: Vitrification of parquet floors Lot 14: Electricity - low currents Lot 15: Heating - refreshment - vMC - plumbing Lot 16: Lift Lot 17: Mobile partition Note: lot 1 - demolition has been the subject of prior consultation and execution of the corresponding contract been carried out

masonry - reinforced concrete

the work will include heavy demolitions of structures involved in the structure such as masonry slitting for bay creation, demolition of miscellaneous structures, descent, handling and removal of grills and miscellaneous materials in landfills

False ceilings - acoustic panels

supply and installation of suspended acoustic panels linked or insulatesupply and installation of horizontal suspended acoustic panelsupply and installation of suspended acoustic objectsdevices and fittings suitable for ceiling support plasterboard horizontal fire-rated 2:00 on the ground floor, 1:00 to R+1 and R+2, and fire stop ½ hour horizontal and crawling to R+3

Modular partitions

supply and installation of solid or glazed interior partitions supply and installation of all fasteners in masonry structures, concrete and structuressupply and installation of all necessary hardware and accessories on integrated doorssupply and installation of glazing of aluminum assemblies supply and installation of aluminum assemblies fillingsoft seals for various caulking necessary for water and air tightness, caulking and dressings necessaryprotection of all structures against oxidationprotection of structures until receipt, adjustments, stakes and lubrications necessary

vitrification of parquet

vitrification of new or existing parquet floors

electricity - low currents

the holder of this lot shall be responsible for: Construction installations, connections "electricity “Electrical panels, general lines between panels, luminaires, equipment, safety lighting, conductors & ducts, power supplies and various services, grounding and grounding fire alarm equipment network telephone installation operatorunalized prewiring telephone - computer security intercom

heating - refreshment - vMC - plumbing

heating - refreshment - vMC - plumbing

Elevator

Elevator

Movable partition

supply and installation of a movable partition

Framing - Blanket - Zinguerie

laying down structures, roofing and zinc plating, overhauling existing structures, cleaning and overhauling natural slate cover works, creation of outlets and ventilation

Exterior joinery - blackouts

supply and installation of joinery works proper, supply and installation of all fixing devices on existing reinforced concrete or masonry structures and any necessary adaptation, supply and installation of all necessary hardware that will have to possess the SFNQ label, flexible joints for various caulking necessary for the air and water tightness

facade wavings - interior

uplifting and stone elevations

Locksmith

with the machining of its works, the work of this batch shall include without restriction: supply and installation of all devices allowing their fastenings/supply and installation of all hardware and accessoriescaulking and sheet metal for cladding necessaryprotection of its works against oxidationadjustments, adjustments and provisions of perfect finishingfinal cleaning of works for reception

Dryer plastering - insulation

supply and installation of drywall and thermal and cleanliningSupply and installation of ceilings on firewall and insulatorplaster fittings following demolition or rendered necessary

Joinery Wood - Parquet

supply and installation of all fixing devices to existing reinforced concrete or masonry structures, wood floor and any necessary adaptationsupply and installation of all necessary hardware to be certified SFNQFlexible seals for various caulking necessary for acoustic impairment or fire resistance internal workings and coverings necessary for a perfect finish of the works protection of works until receipt, adjustments, implementations and lubrications necessary

Painting

Interior and exterior paints

Tiles - earthenware

sealing of Eb+ classified premises, tiles on the floor of wetlands, tiles on the wall of sanitary and garbage rooms, studies and plans of equipment and possible calibration of coatings, devices for prohibiting access of parts during the duration of the coating work and drying times, mortar joints, slubs, silicone etc..., presentation of samples, carpet protection of tiles during the construction site, supply and installation of floor and wall coverings

Download full details as .pdf
The Buyer:
nièvre Aménagement
CPV Code(s):
44111510 - Insulators
44316500 - Smiths' wares
45000000 - Construction work
45232141 - Heating works
45261210 - Roof-covering work
45262311 - Concrete carcassing work
45311200 - Electrical fitting work
45313100 - Lift installation work
45421000 - Joinery work
45421100 - Installation of doors and windows and related components
45421146 - Installation of suspended ceilings
45421152 - Installation of partition walls
45431000 - Tiling work
45432113 - Parquet flooring
45442100 - Painting work
45443000 - Facade work