The performance of the VE430 ventilation systems essentially includes:
- 1 pc. dismantling/disposal Box unit of central HVAC systems
- Approx. 158 m Dismantling/disposal of air ducts made of sheet metal and plastic
- 1 St. Montage RLT-Zentralgerät ca. 6.000 m3/h
- approx. 130 m2 installation of air ducts
- ca. 130 m Rig Rundrohre Wickelfalz
- approx. 35 m2 assembly of round pipes PP pipe
- 2 pcs assembly of precision air conditioners
- 1 control cabinet mounting building automation with approx. 20 data points
- internal electrotechnical wiring of all components, etc
The performance of the VE430 ventilation systems essentially includes:
- 1 pc. dismantling/disposal Box unit of central HVAC systems
- Approx. 158 m Dismantling/disposal of air ducts made of sheet metal and plastic
- 1 St. Montage RLT-Zentralgerät ca. 6.000 m3/h
- approx. 130 m2 installation of air ducts
- ca. 130 m Rig Rundrohre Wickelfalz
- approx. 35 m2 assembly of round pipes PP pipe
- 2 pcs assembly of precision air conditioners
- 1 control cabinet mounting building automation with approx. 20 data points
- internal electrotechnical wiring of all components, etc