Client representation broadband expansion Breitnau II, St. Märgen II, Titisee Neustadt II, Eisenbach II, Hinterzarten II, Oberried II, Stegen, Ihringen, Merdingen, Breisach, Vogtsburg
Los 1 Breitnau IIThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for Lot 1.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the annex specifications for lot 1 to the tender documents, to which reference is made in full.
Lot 10 BreisachThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for lot 10.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the specifications for Lot 10 annex to the tender documents, to which reference is made in full.
Lot 11 VogtsburgThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for lot 11.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the specifications for Lot 11 annex to the tender documents, to which reference is made in full.
Los 2 St. Märgen IIThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for lot 2.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the specifications for Lot 2 annex to the tender documents, to which reference is made in full.
Lot 3 Titisee-Neustadt IIThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for Lot 3.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the specifications for Lot 3 annex to the tender documents, to which reference is made in full.
Los 4 Eisenbach IIThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for Lot 4.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the specifications for Lot 4 annex to the tender documents, to which reference is made in full.
Los 5 Hinterzarten IIThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for Lot 5.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the specifications for Lot 5 annex to the tender documents, to which reference is made in full.
Lot 6 Oberried IIThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for lot 6.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the specifications for Lot 6 annex to the tender documents, to which reference is made in full.
Los 7 AlleysThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for lot 7.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the appendix specifications for lot 7 to the tender documents, to which reference is made in full.
Lot 8 IhringenThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for lot 8.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the annex to the specifications for lot 8 to the tender documents, to which reference is made in full.
Lot 9 MerdingenThe Zweckverband Breitband Breisgau-Hochschwarzwald (ZVBBH) sees in the
Supplying schools, tradespeople and citizens with
high-performance and future-oriented fibre optic connections
important mission. For this reason, the Zweckverband Breitband intends to
Breisgau-Hochschwarzwald in the entire association area for schools,
Hospitals, industrial estates and underserved areas (whites)
Spots) the construction of "ready-to-use", "functional" and
"fully functional" passive FTTB broadband and backbone infrastructures
for an NGA network.
The Zweckverband Breitband Breisgau-Hochschwarzwald comprises 40 cities
and municipalities of the district Breisgau-Hochschwarzwald as well as the
Landkreis Breisgau-Hochschwarzwald itself.
Since the Zweckverband Breitband Breisgau-Hochschwarzwald (hereinafter referred to as the Zweckverband Breitband Breisgau-Hochschwarzwald)
The contracting authority) has decided on the operator model, shall be determined by the
Clients passive FTTB broadband and backbone infrastructures
which remain his property.
The client already has general contractors for Cluster I for 6 lots
Commissioned.
Therefore, the Zweckverband Breitband Breisgau-Hochschwarzwald currently writes
for Cluster I with a total of 6 lots, the expansion of passive FTTb riding belt
and backbone infrastructures for an NGA network (hereinafter
also differentiates "NGA expansion white spots" or "backbone").
The general contractor was charged with the preparation of "ready-to-use",
"functional" and "fully functional" passive FTTB broadband and
Backbone infrastructure for an NGA network to serve the underserved
Territories and objects. In addition to the
(Manufacturing) Construction services themselves, in particular additional consulting and
Planning services for (manufacturing) construction services, construction controlling,
Surveying and documentation tasks.
The scope of services of the general contractor for the NGA expansion refers to
on eligible areas and objects in each lot covered by
Federal and state funding programme (co-financing) as "white spots"
be subsidised. In addition, the development of the
Backbone infrastructures via the Baden-Württemberg state funding programme
supported. Similarly, in the entire territory of the association, non-eligible
provide services such as the "local network".
The project is to be carried out in accordance with the guideline "Funding to support the
Broadband expansion in the Federal Republic of Germany" and according to the
Administrative regulation of the Ministry of the Interior for co-financing of support from the Directive on support for broadband roll-out in the
Federal Republic of Germany (VwV broadband co-financing) and VWV
Broadband promotion.
The contractor shall inform the Zweckverband Breitband
Breisgau-Hochschwarzwald in the context of the expansion project described in detail in the appendix specifications for lot 9.
The tasks of the contractor include all those responsible for ensuring the
technical, economic, qualitative and timely realization of the
NGA expansion
These include:
· Bauoberleitung
· On-site construction supervision
· Monitoring of house connection management
· Participation in status assessments
· Monitoring of technical documentation
· Systemic monitoring of technical documentation
The execution period depends on the funding law
Award of the general contractor invitation to tender by the
Client, the start and end of construction of the general contractor,
Completion of the documentation and settlement of the measure vis-à-vis
the funding provider as well as documentation and network transfer
to Vodafone GmbH.
The general contractor has to provide his services by six months at the latest.
before the end of the period of authorisation.
Everything else, in particular with regard to the expansion project itself, can be found in the specifications for Lot 9 to the tender documents, to which reference is made in full.