Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
08 October 2019
Closing Date:
20 November 2019
Location(s):
DEA58 Märkischer Kreis (DE Germany/DEUTSCHLAND)
Description:
A45 road renewal "Los Meinerzhagen II" FR Dortmund, km 68,768 - 77,809, Trays 1 to 4; AM Lüdenscheid (10-19-0087)

For the BAB A45 in the maintenance section north of the Meinerzhagen valley from the Viaden valley bridge from km 68 + 768 to km 77 + 809, valley bridge Germinghausen, north of the AS Drolshagen, in FR Dortmund is a renewal of all lanes as well as the standing, edge, deceleration and acceleration ramps and interchange ramps for 2020/2021.


Ceiling construction, ceiling repair on bridges

- about 24 780 m 3 Milling in different thicknesses and layers,

- about 11 150 m 3 Break concrete surface and concrete edge strips,

- about 66 000 m 3 Profile the base course / frost protection layer,

- about 3 300 m 3 Make a gravel / frost protection layer (in roadworks and in the area of banquets),

- peel about 23,000 m banquets,

- approx. 80,000 t disposal LAGA Z2,

- about 77 700 m 2 AC 32 TS,

- about 83 300 m 2 AC 22 BS,

- about 79 200 m 2 AC 16 BS,

- about 122 000 m 2 DSH-V 5,

- about 2 200 m 2 AC 11 DS,

- produce approx. 58 800 m seam in the respective layer,

- produce about 43 900 m joints,

- Produce approx. 10 000 m of waterproofing

- break off about 6 500 m of shelf,

- make about 6 200 m shelves,

- about 50 m 2 Make paving areas,

- remove approx. 70 St.

- install approx. 50 St. street procedures,

- Make approx. 760 m connecting cables.

Amounts included for work in night construction sites

- About 1 560 m 3 Milling in different thicknesses and layers,

- about 23 600 m 2 AC 16 BS,

- about 11 800 m 2 DSH-V 5,

- make approx. 5,000 m seam in the respective layer,

- make approx. 7 610 m joints,

- Produce approx. 1 400 m waterproofing edge.


Restraint Systems

- remove approx. 4 520 m ESP,

- remove about 3 520 m EDSP,

- dismantle about 3,970 m DDSP,

- dismantle about 720 m Super Rail,

- remove approx. 760 m concrete protection wall from in-situ concrete,

- produce approx. 80 m SR H2-W4-A,

- produce approx. 56 m SR H4b-W7-A,

- produce approx. 52 m SR Eco H2-W4-A,

- produce about 3 340 m SR Eco H2-W4-B,

- produce about 5 060 m EcoSafe / 2.0 H1-W4-A,

- produce approx. 40 m EcoSafe / 2.0 N2-W3-A,

- produce approx. 160 m EcoSafe / 1.33 H1-W3-A,

- produce approx. 120 m SR Eco BW H2-W1-B,

- make approx. 10 m SR Eco BW H2-W4-A,

- produce approx. 130 m SR Eco HS H2-W2-B,

- produce approx. 40 m SR Eco HS-BW H2-W1-B,

- make approx. 570 m SR Pro BW H4b-W2-B,

- produce approx. 1,200 m SR Eco MT H2-W4-A,

- produce approx. 2 510 m SR Eco 1a H2-W4-A,

- make about 1 310 m SR Eco double H2-W4-B,

- produce approx. 44 pieces ÜK,

- produce approx. 16 pieces ÜK ÜE,

- make about 14 AEK.


marks

- produce approx. 11 350 m markings 0.15 m type I / II (continuous),

- make about 17 600 m markings 0.15 m type I / II,

(Dash 6 m / gap 12 m)

- produce approx. 70 m markings 0.15 m type I / II,

(Dash 3 m / gap 3 m)

- manufacture approx. 800 m markings 0.30 m type I / II,

(Dash 6 m / gap 6 m)

- make approx. 7 650 m markings 0.30 m Type I / II (continuous),

- produce approx. 220 m markings 0.50 m Type I / II as barrier markings,

- make approx. 40 m markings 0.25 m Type I / II as barrier markings (intersection of connection point),

- produce approx. 930 m markings 0.12 m type I / II (continuous),

- produce approx. 60 m markings 0.25 m type I / II (continuous),

- Make approx. 12 St. arrow markings type I / II.


traffic safety

- approx. 9 Psch traffic safety measures for construction phases with long-term jobs,

- approx. 10 Psch traffic safety measures for construction phase 8 with shorter working places (night construction sites),

- set up / dismantle approx. 31 000 m TSE T3-W4,

- set up / dismantle approx. 900 m tSE H1-W4,

- Produce approx. 60 000 m yellow marking film P7.

Mobile traffic jam warning system

The work in the tender specifications includes the following main services for a mobile traffic jam warning system:

- approx. 6 pc. LED display cross sections for installation in the side and median strip and operate,

- install and operate approx. 6 pc.

- 1 Psch, inter alia, obtain traffic regulations, provide and operate central and control units.

Download full details as .pdf
The Buyer:
strassen.nrw – Autobahnniederlassung Hamm
CPV Code(s):
45000000 - Construction work
45233200 - Various surface works
45233221 - Road-surface painting work
45233280 - Erection of road-barriers
45233292 - Installation of safety equipment