Primary school Waggum, renovation (flooring work)
Execution in up to 4 construction phases:
- Approx. 110 m 2 Demolition of floor covering break PVC and carpet,
- about 700 m demolition of baseboards,
- dowel and cast cracks in existing screed approx. 100 m,
- about 1 700 m 2 Clean the surface of coarse dirt, screed screed, dispersion primer, leveling of unevenness 3-5 mm over the entire surface,
- About 500 m 2 Polyurethane primer as a spray primer in the old building,
- approx. Pore-filling epoxy primer against residual moisture,
- about 50 m 2 Textile floor covering, needle felt,
- about 1 700 m 2 elastic flooring linoleum, with and without improved sound insulation incl.
- about 1 100 wooden skirting boards,
- about 1 000 m 2 Protective covering with a Revovierungsvlies,
- About 500 m 2 Hardboard as a protective cover.
Execution in up to 4 construction phases:
- Approx. 110 m 2 Demolition of floor covering break PVC and carpet,
- about 700 m demolition of baseboards,
- dowel and cast cracks in existing screed approx. 100 m,
- about 1 700 m 2 Clean the surface of coarse dirt, screed screed, dispersion primer, leveling of unevenness 3-5 mm over the entire surface,
- About 500 m 2 Polyurethane primer as a spray primer in the old building,
- approx. Pore-filling epoxy primer against residual moisture,
- about 50 m 2 Textile floor covering, needle felt,
- about 1 700 m 2 elastic flooring linoleum, with and without improved sound insulation incl.
- about 1 100 wooden skirting boards,
- about 1 000 m 2 Protective covering with a Revovierungsvlies,
- About 500 m 2 Hardboard as a protective cover.