Flood protection measures on the Flöha in Olbernhau - VGE 1.1.8 - Dike strengthening / dike heightening, new construction of HWS wall BT_1.40.2 L.
- 2 700 m
- 6 500 m
- 1 700 m
- 6,000 m
- 500 m
- 2,000 m
- 3 700 m
- 900 m
- 3 200 m
- 500 m
- 1 500 m
- 200 t hydraulic binder for soil improvement,
- 450 m
- 1 000 m
- 2 200 m
- Create 60 m of slope toe protection, armor stones at least KL 1.0 m,
- 300 m
- 100 m
- Set up and operate 200 m open water drainage,
- 70 m cofferdam, set up BigBags,
- 530 m
- 80 m
- 300 m
- 200 m
- 120 m
- 50 m
- 300 m
- 30 m
- delivery and installation of 12 t reinforcing steel,
- 2 slider shaft DN 1500/1500 with spindle valve DN 700/800,
- Transport and dispose of 5 700 t of construction and demolition waste Z2,
- Transport and dispose of 300 t of construction and demolition waste Z0,
- Transport and dispose of 160 t soil DK I,
- 0.3 t remediation of hazardous substances tar sealing,
- 0.15 t of hazardous material remediation asbestos panels,
Brief description: Approx. 72 m dismantling of the existing dike and construction of a new dike with sealing beams including the installation of a dike crossing and approx. 42 m dismantling of the existing dike and new construction of a massive flood protection wall.