Planning and construction of the technical equipment of the future steam locomotive workshop in Wernigerode.
Planning, production, delivery and installation of 4 cranes, 60 t, 6 t, 3 t and 1.5 t.
Planning, delivery and installation of 3 lifting track systems as underfloor lifting systems for narrow-gauge railways with gauge 1 000 mm in the site-made track pit for lifting and lowering steam locomotives.
Planning, delivery and installation of a painting, spraying, cleaning and drying cabin for repair and cleaning work on steam locomotives