Front-end shovel loaders | Tenderlake

Front-end shovel loaders

Contract Value:
EUR 1M - 1M
Notice Type:
Contract Notice
Published Date:
20 December 2022
Closing Date:
23 January 2023
Location(s):
BE35 Prov. Namur (BE Belgium/BELGIQUE-BELGIË)
Description:
Contract for the supply of wheel loaders

The market is divided into lots as follows:

Lot 1 "Long arm wheel loaders equipped with a 4 m³ bucket"

The acquisition, delivery, adjustment, commissioning and training of three wheel loaders, with a net engine power of at least 190 hp, an engine torque of at least 900 Nm.

These loaders will be equipped with long arms and a 4m³ bucket with hydraulic lids and mounted in direct attachment. The height at the tipping axis of the bucket will be at least 5 meters to allow the loading of semi-trailers. The static tilting load of a fully robbed machine shall be at least 7 tonnes.

A maintenance contract for 10,000 hours is a required option, as well as a cabin pressurization system.

• Use of chargers:

The shippers will be used to operate BEP Environnement's Waste Transfer Centres.

They are likely to execute ... (see contract documents)

Long-arm wheel loader equipped with a 4 m³ bucket with hydraulic lids

See II.2.1

Standard arm wheel loader equipped with a 6 m³ HD bucket

See II.2.1

Download full details as .pdf
The Buyer:
BEP Environnement
CPV Code(s):
43250000 - Front-end shovel loaders