The municipal utility NünbergBad wants to restart the Volksbad. The aim of the revival of the people's bath is a general renovation, which allows an economic operation of the object, with the focus in the future on the operation as a bath (with public, school and club swimming) supplemented by related water applications (health) and a gastronomic offer ,
For this purpose, planning offices are invited to participate in the competition, which cover the performance picture structure (Lph 1-6) and in the past have implemented similar measures as a single applicant or in the project team. The basis of the planning is a planning study from the year 2015. A sensitive handling of monument protection relevant aspects must take place, at the same time the adjoining real estate in co-operation with the
City Planning Office of the City of Nuremberg are integrated into the concept and developed.
Engineering services Structure of the service phases 1-6 HOAI, The commissioning of the LPH is gradual