Expansion of the Gemeinschaftsschule Korb at the Urbanstraße location - extension of new construction and energy renovation
Total construction costs (KG100-700): 9 423 000 EUR gross
GFA: 2 230 sqm
BRI: 8,800 cbm
Trade: heating installation
Heating equipment:
1 St. air-water heat pump; 1 St. buffer memory; 1 hot water heater; 640 m threaded pipes; 420 m steel pipes; 1 St. heating distributor; 67 pieces of fittings; 13 pumps; 1 pc pressure maintenance station; 1 St. dessert device; 13 St. tubular radiators; 7 500 m FBH pipes; 7 St. HKV