Construction work | Tenderlake

Construction work

Contract Value:
EUR 5M - 5M
Notice Type:
Contract Notice
Published Date:
07 May 2021
Closing Date:
08 June 2021
Location(s):
DEA36 Recklinghausen (DE Germany/DEUTSCHLAND)
Description:
New construction of the B474n OU dates 3rd construction phase

The 3rd construction phase begins north of the Dortmund-Ems Canal and ends sharpening in the B235 at section 32, station 2+679. 2 bridge structures will be built for this purpose, one structure will be built in the course of the B474 via the Dattelner Mühlenbach at about km 10+251 and a bridge structure in the course of the laying of the Natroper way at about 10+341 via the B471 4.

The new node node of the B235 in the direction of dates is perpendicular to the B474 at the intersection and is therefore subordinated to the B474. The intersection is light-signal-driven and has separate left or right turn lanes. A special access road is planned at the intersection for the management of the adjacent agricultural land. There are no other direct access to the B474.

The section of the B235 is equipped with a one-sided walkway and bicycle path, as well as a safety separating strip. A traverse point is also set up in the connection area of the B235 towards dates. In the direction of Olfen, a bus stop on the street “zum Ringofen” is added to the east. The crossing point and bus bay receive tactile elements.

The drainage of the line is ensured via road troughs. Due to the sloped situation, these are partially separated by crossbars. As far as possible, the troughs are produced with a zero gradient to ensure optimum infiltration. In the transition from the 1st to the 3rd construction phase, the section directly behind the bridge over the Dortmund-Ems Canal, cascade recesses are planned on both sides for retention, evaporation and infiltration. These end into the road hollows in the 3rd construction phase.

Compensation measures are carried out next to the B474 until the Natroper Weg, including bat protection fences, as well as various afforestations.

The work advertised in part A contains the following main services:

— approx. 10 000 m3 upper floor removal,

— approx. 3,500 m3 top floor application,

— approx. 11 500 m3 earth removal,

— approx. 25 000 m3 earth order,

— approx. 7 800 m2 pavement departure,

— approx. 9 500 m3 antifreeze layer (0/45),

— approx. 20 000 m2 asphalt base layer of AC 22 TS,

— approx. 18 000 m2 asphalt binder layer of AC 16 BS,

— approx. 25 000 m2 asphalt surface layer of SMA 8 p.

Diverse borders and pavements

Various signage and markings

Foundations, cable laying for a light signalling system.

Download full details as .pdf
The Buyer:
Regionalniederlassung Ruhr – Haus Bochum
CPV Code(s):
45000000 - Construction work
45233124 - Trunk road construction work