The contract will consist of works on two geographical locations, respectively Ånestad in Løten
kommune and at Grindalsmoen in Elverum kommune, and is a preparatory contract for the OPS project between Ommangsvollen and Grundset.
Ånestad: The works consist of construction of parallel driven pedestrian/bicycle paths along National Road 25 from Brandsrudvegen and up until the junction with National Road 3, a length of approx. 800 metres. On this stretch there is also an approx. 18 metre reinforced concrete bridge and there is new lighting, Furthermore, this contract consists of new driving roads, partially also with footpaths in the area around Myklegard, length approx. 700 metres. Together, the initiatives stretch over a length of approx. 1.5 km.
It is presumed that there is no rock present. Uncompacted materials under-soil/vegetation cover is used for road fillings. There is a combined matter deficit of 4 — 5,000 m
Grindalsmoen: The works consist of expansion of the current National Road 3/25 to a four lane road over a stretch of 800 metres, included here is also a new roundabout. Furthermore there is construction of another roundabout, approx. 1,000 metres driving roads and approx. 1,300 metres of pedestrian/bicycle paths. Two pedestrian/bicycle culverts shall be constructed in reinforced concrete, length respectively 16.8 and 17.3 metres, light opening of 4.5 m x approx. 3.5 m. Both underpasses are founded on uncompacted materials and they shall have lighting in the ceiling.
It is at this location that the overall uncompacted material surplus is 100 000 m