Architectural, interior design, lead consultant and principal designer services in relation to the Painted Hall. The works comprise:
— New inclusive entrance: partitions, ramps, steps, reception area, desk and associated display, lockers, decorations;
— Adaptations to King's entrance: wash-rooms, storage areas, conservation / decoration;
— Access ramp improvements (KW colonnade step);
— Draft lobbies/ draft doors to inclusive and King's entrances;
— Draft lobby in vestibule (if required);
— Draft proofing eastern cupola/ dome;
— Solar shading to painted hall windows;
— Joinery: lower pH perimeter heating ducts, miscellaneous fittings;
— KW under-croft cafeteria/ brasserie installation (non-HLF);
— KW kitchen works associated with Ampersand re-fit, e.g. flooring, drainage, etc. (non-HLF);
— Furniture: pH benches (Provisionally 20 No in lower hall, 4 No in under-croft);
— Donors boards;
— KW secure retail design;
— Printed vestibule screen;
— Builders work in connection (BWIC) with all building services.
The construction budget is in the region of 4 000 000 GBP.