A design plan for the complete recovery of waste from the ELK (storage chamber) 8a on the 511 m level of the Asse II mine is to be made following the existing concept planning.
The basis for this is the concept planning "Concept planning for the retrieval of radioactive waste from the 511 m level". It is necessary to check the input data, to specify the equipment and the intended technology, to plan the procedures of retrieval and to prepare documents in preparation of an atomic license and mining license.
A design plan for the complete recovery of waste from the ELK (storage chamber) 8a on the 511 m level of the Asse II mine is to be made following the existing concept planning.
The basis for this is the concept planning "Concept planning for the retrieval of radioactive waste from the 511 m level". It is necessary to check the input data, to specify the equipment and the intended technology, to plan the procedures of retrieval and to prepare documents in preparation of an atomic license and mining license.