The contract relates to the supply of energy and a set of related services. Its main purpose is the supply of 100% renewable power and electrical energy, the supply of natural gas to the sampling points listed in Annex 2 to the specifications and the services described in point II "Technical clauses".
This contract consists of 2 Lots:
• Lot 1: Supply Electricity 100% renewable for the period from 01/01/2023 – 31/12/2026
• Lot 2: Natural Gas supply for the period from 01/01/2023 – 31/12/2026
Supply Electricity 100% renewable for the period from 01/01/2023 – 31/12/2026Supply Electricity 100% renewable for the period from 01/01/2023 – 31/12/2026
Natural Gas supply for the period from 01/01/2023 – 31/12/2026Natural Gas supply for the period from 01/01/2023 –
31/12/2026