A school with integrated kindergarten will be built on the site on the basis of a competition. The new building is located as an angular building on the northwest corner of the property. The property is bounded in the north by the railway lines and in the south by the
Dr. Carlo Schmid Street. The access takes place via Dr.-Carlo-Schmid-Straße. The building consists of 3 floors to the west, the east is
Two storeys, it doesn't have a basement. Public access to pedestrians and pedestrians runs through the property in the east
Cyclist underpass in the form of a tunnel structure, which will be extended to Dr. Carlo-Schmid Straße as part of the construction project.
CS83-B-41 Built-in Furniture
Short description:
300 m2 built-in wardrobes school glazed in three-layer panels silver fir
92 m2 fitted kitchens school coated in chipboard HPL
15 m2 built-in wardrobes kindergarten in glued oak oiled / chipboard HPL coated
25 m2 fitted kitchens kindergarten oiled in glued oak
2 pc doors glazed with wooden block frame white fir
Relocation of existing furniture