LOT EMSR:
Complete EMSR, AUT, PLT, NW services for the general overhaul of an existing waterworks.
Including new low-voltage main distributions, sub-distributions, conversions/new building installation, new construction of complete SIMATIC automation technology and network technology in hardware and software; new Siemens WinCC process control system in hardware and software in fully virtualized server-client architecture; compliance with all requirements for automation technology, network technology and process control technology in accordance with BSig/IT SigE 2.0 for critical infrastructures in Germany;
Integration into the existing administration environment and the existing central process data archiving system ACRON;
For adaptations to existing user software, there is an ongoing maintenance contract with a company that has to provide the services. In addition, various programming work, for example on network components, is mandatory due to the AG's legal classification as a critical infrastructure by ISO27001 certified specialist companies.
The construction period is 4 years in close dependence on other trades (a wide range of parallel building and civil engineering services as well as equipment services in the same waterworks), with which intensive coordination is required. Multiple interruptions in service delivery are necessary.
Ongoing water plant operation must always be maintained.
LOT structural repair:
structural repair of the existing filter hall axes A to C; demolition, painting, concrete renovation; tiling work,
see point 2.2.4 for further details
EMSRComplete EMSR, AUT, PLT, NW services for the general overhaul of an existing waterworks.
Including new low-voltage main distributions, sub-distributions, conversions/new building installation, new construction of complete SIMATIC automation technology and network technology in hardware and software; new Siemens WinCC process control system in hardware and software in fully virtualized server-client architecture; compliance with all requirements for automation technology, network technology and process control technology in accordance with BSig/IT SigE 2.0 for critical infrastructures in Germany;
Integration into the existing administration environment and the existing central process data archiving system ACRON;
For adaptations to existing user software, there is an ongoing maintenance contract with a company that has to provide the services. In addition, various programming work, for example on network components, is mandatory due to the AG's legal classification as a critical infrastructure by ISO27001 certified specialist companies.
The construction period is 4 years in close dependence on other trades (a wide range of parallel building and civil engineering services as well as equipment services in the same waterworks), with which intensive coordination is required. Multiple interruptions in service delivery are necessary.
Ongoing water plant operation must always be maintained.
structural repair of axles A to Cstructural repair of the existing filter hall axes A to C; demolition, painting, concrete renovation; tiling work,