This list of services includes the services for the redesign of the outdoor facilities in area B06 Kaiserin-Auguste-Viktoria-Park.
Road construction work and biological engineering work (renaturation measures) must be carried out for the creation of the outdoor facilities. In addition, water and power lines are to be delivered and laid for the underground development.
Demolition work:
- 1,325 m
- Demolish 100 m³ of surface / base layers made of unbound building material mixtures,
- 10 m
- Demolish and dispose of 60 m chain link fence,
- 100 m
- Break off two concrete bridges and dispose of them.
earthworks:
- 310 m
- 310 m
- 430 m
- 150 m
- 370 m
Road construction work:
- 1 800 m
- 80 m
- 8 m gabion walls with filling, height 100 cm.
Internals:
- Pick up and install 2 bench seats from the depot AG,
- 2 pieces of grating 500 x 1 550 mm,
- Pick up and install 1 waste container from the depot AG,
- Pick up 11 pieces of old town lights from the depot AG and install them,
- 3 bicycle leaning brackets made of bent steel tubing.
Civil engineering lines:
- Delivery and installation of 600 m pressure pipes PE100, OD 63 x 5.8 SDR 11,
- Delivery and installation of 200 m PE100 pressure pipes, OD 50 x 4.6 SDR 11,
- 3 garden hydrants,
- 1 450 m cable protection pipe OD 110 x 10 mm to be delivered and installed,
- Lay 1 450 m of power cable NYY-J 5 x 6 qmm delivery.