Description:
'Reception and further management of waste code 19 12 12 and ex 19 12 12 - other waste (including mixed substances and objects) from mechanical waste treatment other than those listed in 19 12 11. '

The subject of the contract is the successive collection and management service of waste code 19 12 12 - other waste (including mixed substances and objects) from mechanical waste treatment other than those listed in 19 12 11 (large-sized waste in fragmented form). Waste from the grinding process using the DOPPSTADT DW 3060 free-speed grinder and waste code ex 19 12 12 - other waste (including mixed substances and objects) from mechanical waste treatment other than those listed in 19 12 11 (bulky waste) resulting from manual dismantling.

The subject of the contract is the successive collection and management service of waste code 19 12 12 - other waste (including mixed substances and objects) from mechanical waste treatment other than those listed in 19 12 11 (large-sized waste in fragmented form). Waste from the grinding process using the DOPPSTADT DW 3060 free-speed grinder and waste code ex 19 12 12 - other waste (including mixed substances and objects) from mechanical waste treatment other than those listed in 19 12 11 (bulky waste) resulting from manual dismantling.

The amount of waste to be transferred to the Contractor during the term of the contract) will be a maximum of 3,000 Mg.

The Contractor shall use waste in accordance with the applicable laws and recovery processes listed in Annex 1 to the Act of 14 December 2012 on Waste.

Transport of waste on the Contractor's side, at his expense, also in terms of carriage costs, insurance for the duration of transport and unloading.

Loading will be carried out with the equipment of the Ordering Party - a charger. The Contractor shall carry out the collection of waste by means of transport enabling loading with equipment of the Contracting Authority.

Implementation of the service on working days during the working hours of the plant.

Total: the amount of waste to be developed during the duration of the contract may be reduced by a maximum of 30%.

Where the quantity of waste delivered during the period of the contract shall be less than the quantity set out in the description, the Contracting Authority has the right to withdraw from further supply of waste without any financial consequences and compensation to the Contractor.

It is recommended that the Contractor shall make a visual inspection of the waste subject to the order on the premises of the Ordering Party's installation on working days from 7:00-15:00 after the prior appointment of the deadline with the Contracting Authority.

Waste weighing will take place on the legalised weight of the Ordering Party and will be preceded by each time the generation of a waste transfer card in the electronic BDO system. The Contractor will confirm in the electronic BDO system the amount of waste received each time for the management of the code 19 12 12 and ex 19 12 12.

The Ordering Party will be required to draw up an electronic waste transfer card in the BDO system in accordance with the Act of 14 December 2012 on Waste (Journal of Laws of 2021 item 779 as amended) and the Contractor will be required to confirm it at the time of seizure of the waste.

In the absence or wrongly confirmed by the Contractor of the Waste Transfer Card or the absence of other required documents, the Contracting Authority has the right to refuse to pay the VAT invoice until the relevant documents are provided. Information about refusal to pay will be communicated to the Contractor, conversely, via fax.

The Contractor shall accept waste from the Contracting Authority in a succession manner consistent with the needs of the Contracting Authority.

At the time of transfer of the waste by the Contractor to the Contractor, the Contractor shall assume responsibility for the seized waste and due handling thereof and the consequences resulting from it.

The Contractor is obliged to provide written information to the Contracting Authority on how to use the received waste after the end of each half year in accordance with the Act of 14 December 2012 on waste (Journal of Laws of 2020 item 797, amended) in which the collection of waste will take place, within 14 December 2012. days from the end of each half year. The site for waste management must meet the requirements set out in the Act of 14 December 2012 on Waste (Journal of Laws of 2020, item 797, as amended).

The Contractor is obliged to have the power to perform the activities covered by the contract, i.e. appropriate waste management decisions of code 19 12 12 and ex 19 12 12. In the case of joint execution of the contract by several entities (e.g. consortium), obliged to having the permissions is any Contractor actually performing the action or