Sewer cleaning services | Tenderlake

Sewer cleaning services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
22 September 2023
Closing Date:
24 October 2023
Location(s):
DEA27 Rhein-Erft-Kreis (DE Germany/DEUTSCHLAND)
Description:
Sewer cleaning and TV inspection 2024

Sewer cleaning and TV examination acc. SüwVO Abw NRW 2013

Meckenheim

Sewer network city of Meckenheim

The majority of the channels are made of concrete or reinforced concrete pipe, some of the channels are made of PVCU and STZ.

In the town of Meckenheim, the maximum channel depth is 10 m, usually the channel depth is 2.0 - 4.0 m.

The channels are both channels in the mixing system as well as in the separation system (rainwater and dirty water channel).

The disposal of the cleared goods is carried out by the Erftverband. The clearing material is only to be deposited in the designated container at KA Flerzheim. Proof of delivery to the sewage treatment plant must be provided. The rinsing water for the sewers is made available to the contractor free of charge at the Flerzheim sewage treatment plant. The water absorption and the disposal of the material to be removed must be clarified in advance with the responsible authorities.

The service time is:

Mon - Thu 9:00am to 3:00pm,

Fri 9:00am to 1:00pm

Zülpich

The majority of the ducts are made of concrete or reinforced concrete pipe, some of the ducts are made of

PVCU and STZ have been laid.

In the case of the city of Zülpich, the maximum canal depth is 5 m, as a rule, the canal depth is

2,0 - 3,0 m.

The channels are both channels in the mixing system as well as in the separation system (rainwater and dirty water channel).

The disposal of the clearing material is carried out by the Erftverband. The clearing material is only to be deposited in the designated container at the Geich pumping station (former sewage treatment plant). The rinsing water for the sewers is provided to the contractor free of charge on the designated facilities. The water intake and disposal of the clearing material must be clarified in advance with the responsible authorities.

The service time is:

Mon - Thu 9:00 a.m. to 3:00 p.m.,

Fri 9:00 a.m. to 1:00 p.m.

Rommerskirchen

The majority of the channels are made of concrete or reinforced concrete pipe, some of the channels have been laid as PVCU and STZ.

The maximum canal depth in the municipality of Rommerskirchen is 5 m, usually the canal depth is 1.0 - 3.5 m.

The channels are both channels in the mixing system as well as in the separation system (rainwater and dirty water channel).

The rinsing water for the sewers is provided to the contractor free of charge during the service hours Mon - Fri 9:00 a.m. to 3:30 p.m. at the Anstel sewage treatment plant.

The disposal of the clearing material is carried out by the Erftverband. The clearing material must be deposited in the designated container at the Anstel sewage treatment plant.

Weilerswist

The majority of the channels are made of concrete or reinforced concrete pipe, some of the channels have been laid as PVCU and STZ.

The maximum canal depth in the municipality of Weilerswist is 5 m, usually the canal depth is 1.0 - 3.5 m. The sewers are both sewers in the mixing system and in the separation system (rainwater and dirty water sewer).

The rinsing water for the sewers will be provided to the contractor free of charge during the service hours Mon - Fri 9:00 a.m. to 3:30 p.m. at the Weilerswist sewage treatment plant.

The disposal of the cleared goods is carried out by the Erftverband. The cleared goods are to be deposited at the old KA Metternich or KA Kessenich site in the designated containers.

Connection collector

The majority of the channels are made of concrete or reinforced concrete pipe, some of the channels have been laid as PVCU and STZ.

The maximum channel depth is 5 m, usually the channel depth is 1.0 - 3.5 m.

The channels are both channels in the mixing system as well as in the separation system (rainwater and dirty water channel).

The disposal of the clearing material is carried out by the Erftverband. The location of the containers must be agreed with the Erftverband 2 weeks before the start of the work. The clearing material is only

to be deposited in the designated container on the designated facilities. Proof of delivery to the sewage treatment plant must be provided. The rinsing water for the sewers is provided to the contractor free of charge on the designated facilities. The water intake and disposal of the clearing material must be clarified in advance with the responsible authorities.

The service time is:

Mon - Thu 9:00 a.m. to 3:00 p.m.,

Fri 9:00 a.m. to 1:00 p.m.

Download full details as .pdf
The Buyer:
Erftverband
CPV Code(s):
90470000 - Sewer cleaning services
90491000 - Sewer survey services