Medite intend to build a facility for the preparation of wood chip which will be used in the manufacture of a recently developed new product, Medite Tricoya. The proposed location for the new facility will be on a specific part of the existing site and will be carried out with only the minimum of interaction or disruption to the normal production plant operation. It is estimated that the area required for the new facility will be approximately 15 000m